Program |
Checklist |
Credit |
Requirement |
|
LEED-NC LEED-CS LEED-S LEED-CI |
Materials and Resources |
Recycled Content M.R. 4.1 |
Use materials with recycled content such that the sum of post-consumer recycled content plus one-half of the pre-consumer content constitutes at least 10% (based on cost) of the total value of the materials in the project. |
|
LEED-NC LEED-CS LEED-S LEED-CI |
Materials and Resources |
Recycled Content M.R. 4.2 |
Use materials with recycled content such that the sum of post-consumer recycled content plus one-half of the pre-consumer content constitutes an additional 10% beyond MR Credit 4.1 (total of 20%, based on cost) of the total value of the materials in the project. |
Krieger Products |
Post-consumer Recycled Steel |
Pre-consumer Recycled Steel |
Combined Percentages |
Percent of Recycled Content by Weight |
Percent recycled by cost |
| Frames | 23.5% | 6.5% | 30.4% | 30.4% | 15% |
| Sound Doors | 23.5% | 6.5% | 30.4 | 17%-25% | 15% |
| Bullet Doors | 23.5% | 6.5% | 30.4% | 24.4% | 15% |
| Door Frames | 23.5% | 6.5% | 30.4% | 17%-25% | 15% |
| Cam-Lift Hinges | 55% | 12% | 77% | 17%-25% | 15% |
| Thresholds | 18% | 49% | 67% | 17%-25% | 15% |
| Astragals | 23.5% | 6.5% | 30.4% | 17%-25% | 15% |
Program |
Checklist |
Credit |
Requirement |
|
LEED-NC LEED-CS LEED-S LEED-CI |
Materials and Resources |
10% Locally Harvested Materials M.R. 5.1 |
Use building materials or products that have been extracted, harvested or recovered, as well as manufactured, within 500 miles of the project site for a minimum of 10% (based on cost) of the total materials value. If only a fraction of a product or material is extracted/ harvested/recovered and manufactured locally, then only that percentage (by weight) shall contribute to the regional value. |
|
LEED-NC LEED-CS LEED-S LEED-CI |
Materials and Resources |
20% Locally Harvested Materials M.R. 5.2 |
Use building materials or products that have been extracted, harvested or recovered, as well as manufactured, within 500 miles of the project site for an additional 10% beyond MR Credit 5.1 (total of 20%, based on cost) of the total materials value. If only a fraction of the material is extracted/harvested/recovered and manufactured locally, then only that percentage (by weight) shall contribute to the regional value. |
Program |
Checklist |
Credit |
Requirement |
|
LEED-CS LEED-S |
Materials and Resources |
Rapidly Renewable Materials M.R. 6 |
Use rapidly renewable building materials and products (made from plants that are typically harvested within a ten-year cycle or shorter) for 2.5% of the total value of all building materials and products used in the project, based on cost. |
| LEED-NC |
Materials and Resources |
Certified Wood M.R. 7 |
Use a minimum of 50% of wood-based materials and products, which are certified in accordance with the Forest Stewardship Council's (FSC) Principles and Criteria, for wood building components. |
Program |
Checklist |
Credit |
Requirement |
|
LEED-NC LEED-CS LEED-S LEED-CI |
Low Emitting Materials: Paints and Coatings EQ 4.2 |
See LEED-CS EQ 4.2 | There are no detectable amounts of VOCs in Krieger products at the point of installation. |